Site Preparation - Sub-Zero IC-27R Installation Manual

Hide thumbs Also See for IC-27R:
Table of Contents

Advertisement

Site Preparation

Opening Dimensions
INTEGRATED MODELS
25"
(635)
OPENING DEPTH
SIDE VIEW
Opening Dimensions
IC-27R and IC-27FI
700TR, 700TFI, 700TCI
736TR, 736TFI, 736TCI
700BR, 700BF(I), 700BC(I)
TOP VIEW
25"
(635)
OPENING
DEPTH
B
A
OPENING
OPENING WIDTH
HEIGHT
FRONT VIEW
A
27"
(686)
27"
(686)
36"
(914)
27"
34
(686)
IMPORTANT NOTE: The depth of each integrated model is
24"
(610)
may necessitate moving the unit back or cabinets forward to
achieve a flush fit. This will require a minimum rough opening
depth of 25"
B
81"
(2057)
80"
(2032)
80"
(2032)
1
/
"
(876)
2
from the front of the unit to its back. Your design
.
(635)
7
subzero.com/specs

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents