Pressurizing The Pedestal - Vinten Vision Ped Plus Operator's Manual

Studio pedestal
Hide thumbs Also See for Vision Ped Plus:
Table of Contents

Advertisement

Column
Instal the column on the skid as follows:
Fully slacken the skid clamp (11).
Ensure the control valve
Release the Velcro retaining strap (6).
Hold the telescopic column upright with the steering ring
three struts
(17)
Lift the column assembly by the steering ring and lower it vertically into the skid centre cast-
ing, ensuring bottom clamp knob
the foot supports (7).
Secure each strut to the foot support with the rubber strap. Tighten the skid clamp (11), us-
ing moderate hand pressure only.
Secure the Velcro retaining strap

Pressurizing the pedestal

The Vision Ped Plus pedestal may be pressurized using the built-in pump, by using the Vinten
Portable Pump or from an external pressure source.
Ascertain the payload to be fitted to the pedestal (payload = pan and tilt head, camera, lens and
all ancillary equipment). Referring to the graph, mark the payload on the horizontal axis then strike
a vertical line from the load figure to the balance line. At the intersecting point strike a horizontal
line to the vertical axis and read off the required gas pressure.
psi
140
120
100
80
60
40
20
0
(2)
is set to the WORK position.
up almost to horizontal.
(18)
is aligned with skid handle. Engage the struts
(6)
clear of the skid wheels.
bar
≤ 9.6 bar
10
(139 psi)
8
6
4
2
0
0
5
10
0
10
20
Pressurization graph
(20)
15
20
25
30
30
40
50
60
uppermost and swing the
(17)
kg
70
lb
on
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents