10. De-Commissioning
10.1 De-Commissioning Procedure
If it is necessary to put the device out of operation for maintenance and/or
storage, please follow the instructions below.
WARNING!
To avoid injuries, please follow the procedures:
◆ Switch off AC circuit breaker to disconnect with electricity grid.
◆ Switch off DC switch to disconnect with DC source.
◆ Switch off the PV array switch to disconnect from the PV array.
◆ Use proper voltage meter to confirm that the AC and DC power
◆ Remove the AC wiring immediately to completely disconnect
◆ Remove the DC wiring to disconnect from PV Array.
◆ Remove the communication module RS-485 connection from
◆ After completing the above steps, the inverter can be removed.
are disconnected from the unit.
from electricity grid.
the computer connection.