Operation Starting Control - Daikin 2MXS40H2V1B Service Manual

Inverter multi for 2 rooms h-series / g-series
Hide thumbs Also See for 2MXS40H2V1B:
Table of Contents

Advertisement

SiBE121123_A
1.3

Operation Starting Control

Outline
Wall Mounted Type: FTXG Series
The system carries out the following control at the beginning to conduct every functional parts
properly.
1. Opening the front panel fully
2. Output of the ∆D signal after the front panel starts moving
3. Opening the flap fully after the front panel opens fully
4. Making the fan rotate when the flap passes over the fan-banned area
Control Flow
Timing Chart
Function and Control
(1)
Opening the front panel fully
(3)
Opening the flap fully
OFF
Fully close
Front
panel
Fully open
Fully open
Flap
Fan-banned area
Fully close
ON
Fan
OFF
Output
∆D
∆0
ON
Force supply
(from the
outdoor unit)
OFF
Start
(4)
Making the fan rotate when
the flap passes over the
fan-banned area
Running
Start
Operation
starting control
The outdoor unit provides force
when it receives the ∆D signal.
Function of RA Indoor Unit
Output of the ∆D signal after
(2)
the front panel starts moving
ON
Under running control
Under operation mode control
Under operation mode control
(R11910)
(R14049)
: Actual position
of panel or flap
: Additional
control of motor
54

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents