Daikin 2MXS40H2V1B Service Manual page 235

Inverter multi for 2 rooms h-series / g-series
Hide thumbs Also See for 2MXS40H2V1B:
Table of Contents

Advertisement

SiBE121123_A
BRC1E51A7
Before test operation
How to activate test operation
How to check airflow direction
How to deactivate test operation
Trial Operation and Field Settings
Step
Action
1
Turn on the power supply more than 6 hours
before test operation.
2
Open the gas stop valve.
3
Open the liquid stop valve.
4
Press and hold the [Cancel] button (
4 seconds to enter the Field setting menu.
5
Use the
buttons to select Test
operation ON/OFF and push the [Menu/
Enter] button (
6
Test operation is displayed on the bottom of
the basic screen.
7
Push the [ON/OFF] button (
seconds to start the test operation.
8
Push the [Menu/Enter] button (
the Main Menu.
9
Use the
buttons to select Airflow
direction and push the [Menu/Enter] button
(
).
10
Check that the airflow direction is actuated
according to the setting and push the [Menu/
Enter] button (
11
Press and hold the [Cancel] button (
4 seconds to enter the Field setting menu.
12
Use the
buttons to select Test
operation ON/OFF in the menu and push the
[Menu/Enter] button (
) for
).
) within 10
) to enter
).
) for
).
Trial Operation
Remote controller
(R12872)
(R12873)
(R12874)
(R12875)
(R12876)
224

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents