Precautions For Slinging Work - Hitachi ZAXIS 450LC-3 Operator's Manual

Hydraulic
Hide thumbs Also See for ZAXIS 450LC-3:
Table of Contents

Advertisement

PRECAUTIONS FOR SLINGING WORK

• Coordinating Signal System, and Appointing
Signal Person
Before starting, be sure to coordinate signal system to be
used. Appoint one qualified signal person only (if a multiple
number of signal persons are used, different signals may
confuse the workers, possibly causing an accident). All
workers should obey signals only from one signal person.
• When attaching a wire rope to the lifting
parts/components, always use slinging protectors between
the wire rope and the lifting parts/components to prevent
damage.
• Precautions for Lifting
• Always use a hook with a latch.
• Use only slinging wire ropes and chains that are strong
enough.
• Never allow the lifted load to pass over any persons.
• Never allow anyone under the lifted load.
• Rectifying Twisted Wire Rope
Rectify the twist or bend of the wire ropes after the work.
Store the wire ropes in a specified place.
ASSEMBLING
6-3
M324-07-171
M324-07-173
M324-07-174

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zaxis 650lc-3Zaxis 850lc-3

Table of Contents