Technical Data - Cannon Professional 60 User Instructions

Hide thumbs Also See for Professional 60:
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS

TECHNICAL DATA

Gas connection
Pressure test point
Gas rate adjustment
Aeration adjustment
Electrical connection
Professional 60
C60DPF
BURNER
HOTPLATE
Front Left
HOTPLATE
Rear Right
HOTPLATE
Front Right and Rear Left
TOTAL LOAD
Traditional 60
F
C60DT
BURNER
HOTPLATE
Front Left and Rear Right
HOTPLATE
Front Right and Rear Left
TOTAL LOAD
Rp ½ (½" BSP female)
Front left hotplate injector
None
None
4mm
twin and earth
2
230/240V a.c. 50Hz.
13A fuse.
HEAT INPUT
4.1 kW
3.05 kW
2.0 kW
HEAT INPUT
3.05 kW
2.0 kW
G20 at 20mbar
INJECTOR
100+72+100
116
103
4.5 / 4.9 kW
G20 at 20mbar
INJECTOR
116
103
4.5 / 4.9 kW
G30 at 28-30mbar
G31 at 37mbar
HEAT INPUT
INJECTOR
3.8 kW (275g/h)
63+42+63
3.0 kW (220g/h)
2.0 kW (145g/h)
G30 at 28-30mbar
G31 at 37mbar
HEAT INPUT
INJECTOR
3.0 kW (220g/h)
2.0 kW (145g/h)
86
70
86
70
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Traditional 60Professional 60

Table of Contents