Reports; Start-Up Report - Buderus Logamax plus GB162-L.B. 80 kW Installation Instructions Manual

Condensing gas boiler
Table of Contents

Advertisement

15

Reports

15
Reports
15.1

Start-up report

▶ Enter your signature and the date after completing the start-up activities.
Start-up activities
1.
Check for gas leaks
2.
Fill the heating system
-
Pre-pressure expansion vessel (refer to the installation
instructions for the expansion - vessel)
-
Heating system filling pressure
3.
Fill the condensate trap with water
4.
Write down the gas characteristics
5.
Bleed the gas supply valve
6.
Check the air/flue gas connection
7.
Checking the appliance configuration
8.
Measure the gas inlet pressure (working pressure)
9.
Carry out a leakage test in operating conditions
10. Check and adjust the flue gases CO
11. Carry out a function test
-
Measure the ionization current
12. Measure the pH-value
13. Boiler settings
14. Final activities
-
Close the boiler door and the control panel
-
Hand over
Confirming proper start-up
Table 27 Start-up report
56
Page
page 34
page 34
page 35
Heat input
Heat output
page 35
page 36
page 36
page 36
page 38
emissions
page 38
2
page 39
page 39
page 40
page 41
Company stamp/signature/date
Measurement results
Remarks
_____________
psi
_____________
psi
3
_____________
btu/ft.
3
_____________
btu/PM
_____________
" W.C.
_____________
ppm
μA
_____________
Fill in the record book
Logamax plus GB162-L.B. 80 kW / 100 kW – 6720645916 (2014/10)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents