Buderus Logamax plus GB162-L.B. 80 kW Installation Instructions Manual page 20

Condensing gas boiler
Table of Contents

Advertisement

6
Installation
Below are approved examples of vertical and horizontal venting
installation
NOTICE
▶ Place pipe supports every 5 ft. (1,525 mm) of
horizontal and vertical run, beginning with support
near boiler.
▶ The condensate must be drained in accordance with
the applicable rules ( § 6.5, page 16).
▶ Periodic cleaning of the vent terminal and air-intake
screens is mandatory.
▶ Avoid locating vent terminals near equipment or
construction which can be subject to degradation
from exhaust gases.
Fig. 25 Horizontal venting system (sealed combustion)
[1]
exhaust 4" (100 mm)
[2]
intake 4" (100 mm)
20
2
1
6720645916-23.1TD
Fig. 26 Concentric horizontal venting system (sealed combustion)
[1]
concentric adaptor 4" (100 mm) / 6" (150 mm)
[2]
exhaust 4" (100 mm) / intake 6" (150 mm)
[3]
place the air intake cap
1
Fig. 27 Horizontal venting system (sealed combustion)
[1]
exhaust 4" (100 mm)
[2]
intake 4" (100 mm)
Logamax plus GB162-L.B. 80 kW / 100 kW – 6720645916 (2014/10)
3
1
2
7746800103-05.1TD
2
6 720 645 916-29.2TD

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents