Toshiba RAS-M10PKVP-E Service Manual page 137

Hide thumbs Also See for RAS-M10PKVP-E:
Table of Contents

Advertisement

No. Part name
∗ Bind TS sensor, TE sensor and TO sensor with the bundling
19
Sensor
wiring
band.
process
∗ Pass TE sensor and TO sensor through upper part of the
(Continued)
inverter fixing board and then bind them with the bundling
band.
NOTE
Using the bundling band being on the market, be sure to bind
the position which was bound.
Procedure
– 137 –
Remarks
Inverter fixing board
Bundling band
Bundling band
TS sensor
TE sensor
TE sensor
TO sensor
TO sensor

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ras-m18pkvp-eRas-3m26uav-eRas-m13pkvp-eRas-m16pkvp-e

Table of Contents