2-17. Test Run Procedure

2
Turn ON the indoor
and outdoor power.
Automatic
Address
Recheck the items to check before the test run.
Check the combination (wiring) of indoor and outdoor units.
YES
Is system "single-type"?
NO
Is outdoor unit multiple?
YES
(See 2-21-2) How to Set the
Outdoor Unit System Address
Set the outdoor unit system address.
(See 2-21-1) How to Set
Automatic Address
Set the automatic address setting from
outside unit or remote controller.
(*) Indicate (mark) the combination number.
Turn ON the indoor and outdoor power.
Set the remote controller to "test run".
Can operation be started?
YES
Return the remote controller to normal control.
(See 2-18)
(See 2-21-1)
NO
(See 2-21-3, 4)
Automatic Address
(See 2-19)
Refer to "Table of Self-Diagnostic
NO
Functions" to check the system.
In addition, refer to Item 2-21 and
correct any items that need to
be corrected.
Note: Check the indoor-side drainage.
(*) Required for simultaneous-operation
multi systems and for group control.
2-16
(See 2-20)
Fig. 2-14