Ricoh B234 Service Manual page 1320

Hide thumbs Also See for B234:
Table of Contents

Advertisement

C. Loosely secure it in place with "3" screws on the left and "3" on the right.
D. Loosely install the "2" top screws. A useful tip might be to secure the Screw to the tip of your
Screwdriver with a small piece of masking tape to assist you in finding the hole.
Once all "8" mounting screws have been properly started you have good alignment.
E.
You may now go back and tighten the screws until they are snug. Do not over
tighten the "2" screws on top!
Install the "2" Screws to secure the Bearing Block for the Pulley arrangement at the rear
Step 16:
of the StreamPunch. Press the block to the top of the punch before tightening
Install the Pulley and Belt onto the Pulley Block. Once properly aligned, check Belt and
Step 17:
Pulley movement. Tighten the Set Screw.
Install the Die Set Storage Rack with "3" screws front and "3" screws back. Remember
Step 18:
to attach the Ground Strap at the middle screw on the rear (belt side). Start each screw
to achieve proper alignment, then go back over each screw and tighten it.
Install the Cable Guard on top of the Die Set Storage Rack ("2" Screws).
Step 19:
Install the curved sheet metal Exit Paper Guide with Idler Roller "4" Screws.
Step 20:
Start all "4" screws, (2 on front and 2 on back) then tighten.
Connect the Sensor Wire Harness at the top rear of the Exit Paper Guide.
Step 21:
To install the Idler Aligner Paper Guide.
Step 22:
A. Hold it loosely in place.
B. Press the Nylon Flange Bearings into place, through both pieces of sheet metal,
with the Flange to the inside
C. Slide the Shaft through the front of the machine, while holding the Nylon Flange
Bearing in place.
D. Secure with "2" E-Rings on the inside of the bearing.
E. Inspect by pressing in on the bottom area of the sheet metal for:
#1 should see a slight deflection of each Idler Roller as you press,
#2 as you press, you can turn the Pulley's at the rear of the StreamPunch and
see the Idler Rollers rotate smoothly.
Bend the small metal tab back into place.
Step 23:
Install the J2 Shaft back into place by inserting it first into the front, then the back.
Step 24:
Close the J2 Flipper Latch.
Step 25:
Repeat the test of rotating the pulleys to ensure smooth rotation of the Idler Rollers.
Attach the J2 Shaft Spring
Step 26:
Install the front E-Ring to secure J2.
Attach the Docking Plate using "4" Screws and install spring from Plate to Door.
Step 27:
Attach the Back Rear Cover using the 7 screws (2 for the Entrance and 5 for the Exit
Step 28:
side).
Test the StreamPunch by running 10 copies in bypass mode,
Then 1 sheet in punch mode,
Then 10 sheets in punch mode,
Then 100 sheets in punch model
This entire process takes approximately 60 minutes. First time maybe a little longer.
36

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents