Ricoh B234 Service Manual page 1313

Hide thumbs Also See for B234:
Table of Contents

Advertisement

Install the Flexible Shaft (item 5).
Step 18:
Install the curved sheet metal Exit Paper Guide (item 7) with Idler Roller "4" Screws.
Step 19:
Start all "4" screws, (2 on front and 2 on back) then tighten.
Connect the Sensor Wire Harness at the top rear of the Exit Paper Guide.
Step 20:
Install the J2 Shaft back into place by inserting it first into the front, then the back.
Step 21:
Close the J2 Flipper Latch.
Step 22:
Repeat the test of rotating the pulleys to ensure smooth rotation of the Idler Rollers.
Attach the J2 Shaft Spring
Step 23:
Install the front E-Ring to secure J2.
To install the Idler Aligner Paper Guide.
Step 24:
A. Hold it loosely in place.
B. Press the Nylon Flange Bearings into place, through both pieces of sheet metal,
with the Flange to the inside.
C. Slide the Shaft through the front of the machine, while holding the Nylon Flange
Bearing in place.
D. Secure with "2" E-Rings on the inside of the bearing.
E. Inspect by pressing in on the bottom area of the sheet metal for:
#1 should see a slight deflection of each Idler Roller as you press,
#2 as you press, you can turn the Pulley's at the rear of the StreamPunch and
see the Idler Rollers rotate smoothly.
ALIGN
& FIX SCREWS
INSTAL j2 SHAFT
ASSEMBLE BACK
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents