Step 1 Mount Template; Step 2 Adjust Frame Height - Monogram ZV925 Installation Instructions Manual

36" island chimney vent hood
Table of Contents

Advertisement

STEP 1 MOUNT TEMPLATE

• Align the template with the marks on the ceiling
and tape in place.
– Be sure the template is oriented correctly with the
front of the hood.
• Use a plumb bob to be sure the mounting holes
will provide parallel alignment with the countertop
below.
• Center punch all hole locations.
• Drill pilot holes in the 4 screw locations. Use a 3/16"
bit and drill approximately 1-1/2" deep.
• Drive 4 hex head wood screws into the center of
the ceiling joists and cross framing. Leave a 1/4"
gap to allow the screw head to engage the keyhole
slots on the support frames.
• Cut the 8-1/2" duct opening through the sheet rock.

STEP 2 ADJUST FRAME HEIGHT

•Measure exact ceiling height.
• Find the exact frame height
required on the chart on page 6.
• Remove 2 screws on each of the
4 sides of the frame to loosen the
upper structure, lower structure
and blower/motor.
• Adjust the height "X", according to
the chart on page 6. Use a total of
32 screws (8 screws on each side)
to secure the upper structure,
lower structure and blower/
motor together.
Installation Instructions
Frame
height
2-3/4"
12
Drill 3/16≤
Pilot Holes
Approx. 1-1/2≤
Deep
10-1/16≤ to
Centerline
of Holes
7-1/16≤ to
Centerline
of Holes
36≤ Hood
Template
Cut a 1≤ Dia.
Wire Access
Hole
FRONT OF HOOD
1/4" Gap
24" min.
Ceiling
height
30" max.
36" min.
Cut a 1≤ Dia.
Wire Access
Hole
Drill 3/16≤
Pilot Holes
Approx. 1-1/2≤
Deep
7-1/16≤ to
Centerline
of Holes
X

Advertisement

Table of Contents
loading

Table of Contents