Installation Instructions; Installation - Vented To The Outside; Step 1, Mount Template; Step 2, Install Upper Support Frame - Monogram ZV850 Installation Instructions Manual

Island vent hood
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION – VENTED TO THE OUTSIDE
1
MOUNT TEMPLATE
• Align the template with the marks on the ceiling and
tape in place.
– Be sure the template is oriented correctly, with the
front of the hood.
• Use a plumb to be sure the mounting holes will provide
parallel alignment with the countertop below.
• Center punch all hole locations.
• Drill pilot holes in the 4 screw
locations. Use a 5/32" bit and drill
approximately 1-1/2" deep.
• Cut wire access hole
approximately 1" dia.
• Cut the 6-1/2" duct opening
through the ceiling.
2
INSTALL UPPER SUPPORT FRAME
• Secure the upper support frame to the ceiling
joists and/or cross framing with the 4 screws
provided. For maximum rigidity and strength, the
screws must be driven into the center of the joists
and/or cross-framing.
• Check to be sure the support frame is level,
vertically and horizontally.

Installation Instructions

Front of Hood
Wire Access Hole
658Dia28
12
3
INSTALL LOWER SUPPORT FRAME
• Insert lower support frame into the upper support
frame and loosely secure with 8 screws and
washers (4 on the front and 4 on the back sides).
• Adjust the lower support frame up or down
to the desired height above the countertop.
Tighten screws.

24" Minimum

30" Maximum

IMPORTANT: Again, check to be sure the support is
level in both directions. There is no way to level the
hood after the hood is secured to the frame.
13-5/8 "

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zv855Zv850spssZv855spss

Table of Contents