Installation Instructions-Vented To The Outside; Step 1, Mount Template; Step 2, Adjust Frame Height - Monogram ZV925 Installation Instructions Manual

Island chimney vent hood
Hide thumbs Also See for ZV925:
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION—VENTED TO THE OUTSIDE
1
MOUNT TEMPLATE
■ A lign the template with the marks on the ceiling and
tape in place.
– Be sure the template is oriented correctly with the
front of the hood.
■ U se a plumb bob to be sure the mounting holes
will provide parallel alignment with the countertop
below.
■ C enter punch all hole locations.
■ D rill pilot holes in the 4 screw locations. Use a 3/16"
bit and drill approximately 1-1/2" deep.
■ D rive 4 hex head wood screws into the center of the
ceiling joists and cross framing. Leave a 1/4" gap to
allow the screw head to engage the keyhole slots on
the support frames.
■ C ut the 8-1/2" duct opening through the sheet rock.
2
ADJUST FRAME HEIGHT
■ M easure exact ceiling height.
■ F ind the exact frame height required
on the chart on page 7.
■ R emove 2 screws on each of the 4
sides of the frame to loosen the upper
structure, lower structure and blower/
motor.
■ A djust the height "X", according to
the chart on page 7. Use a total of
32 screws (8 screws on each side)
to secure the upper structure, lower
structure and blower/motor together.
12
Installation Instructions
Frame
height
2-3/4"
Drill 3/16"
Pilot Holes
Approx. 1-1/2"
Deep
10-1/16" to
Centerline
of Holes
7-1/16" to
Centerline
of Holes
36" Hood
Template
Cut a 1" Dia.
Wire Access
Hole
FRONT OF HOOD
1/4" Gap
24" min.
Ceiling
height
30" max.
36" min.
Cut a 1" Dia.
Wire Access
Hole
Drill 3/16"
Pilot Holes
Approx. 1-1/2"
Deep
7-1/16" to
Centerline
of Holes
X
1" = 2.5 cm; 1' = 0.3 m
49-80329 Rev. 5

Advertisement

Table of Contents
loading

Table of Contents