Step 3 Cut Duct To Length For Vented Installation; Step 4 Install The Support Frame; Step 5 Install Hood Attachment Screws - Monogram ZV925 Installation Instructions Manual

36" island chimney vent hood
Table of Contents

Advertisement

STEP 3 CUT DUCT TO LENGTH FOR
VENTED INSTALLATION
• Measure from
house duct to
exhaust opening.
• Cut the 8" duct
length to size.
• Slip duct over the
exhaust opening.
• Seal the connection
with duct tape.

STEP 4 INSTALL THE SUPPORT FRAME

• Raise the support toward
the ceiling.
• Thread the house wiring
through one of the large
holes, preferably on the
left side.
• Carefully engage the
ceiling mounting screws
to the keyhole slots AND
the house duct in the top
of the frame.
• Tighten the 4 mounting
screws against the frame.
• Install 2 safety screws.
• Use duct tape to seal the
duct connection at the top.
Keyhole
slots
House
wiring
Installation Instructions
House
duct
Duct
length
Frame
height
Duct
Safety
screws
Keyhole
slots
STEP 5 INSTALL HOOD ATTACHMENT
Duct
• Install 4 hood attachment screws in the bottom of
the support as shown. Leave 1/4" gap between
screw head and support flange.
13
SCREWS
Install 4
attachment
screws

Advertisement

Table of Contents
loading

Table of Contents