Step 4 Mount Template; Step 5 Install Support Frame - Monogram ZV1050 Installation Instructions Manual

42" island vent hood
Hide thumbs Also See for ZV1050:
Table of Contents

Advertisement

STEP 4 MOUNT TEMPLATE

• Align the template with the marks on the ceiling and
tape in place.
– Be sure the template is oriented correctly, with the
front of the hood.
• Use a plumb bob to be sure the mounting holes will
provide parallel alignment with the countertop below.
• Center punch all hole locations.
• Drill pilot holes in the 4 screw locations. Use a 5/32"
bit and drill approximately 1-1/2" deep.
• Cut the 8-1/4" duct opening and approx. 1" wire
access hole.

STEP 5 INSTALL SUPPORT FRAME

Upper
Support
Frame
Lower
Support
Frame
Install upper support frame
• Secure the upper support frame to the ceiling joists
and cross framing with the 4 lag screws provided. For
maximum rigidity and strength, the screws must be
driven into the center of the joists and/or cross
framing.
Check to be sure the support frame is level, vertically
and horizontally.
Installation Instructions
Front
Support
Of
Frame
Hood
Opening
Check Level in
Both Directions
Hood
Mounting
Flange
30" Recommended
Install lower support frame
• Insert lower support frame (or accessory support
frame, ZX1059SFSS or ZX10510SFSS) into the upper
support frame and loosely secure with 8 screws and
washers (4 on the front and 4 on the back sides).
• Adjust the lower support frame up or down to the
desired height above the countertop. Tighten screws.
IMPORTANT: Again, check to be sure the support
is level in both directions. There is no way to level
the hood after the hood is secured to the frame.
11
Wire Access Holes
Lower Support
10"
40"
Countertop
76"

Advertisement

Table of Contents
loading

Table of Contents