Step 1, Mount Template; Step 2, Adjust Frame Height - Monogram ZV925 Installation Instructions Manual

36" island chimneyvent hood
Hide thumbs Also See for ZV925:
Table of Contents

Advertisement

Installation
instructions
INSTALLATION-VENTEDTO THE OUTSIDE
ISTEP 11 MOUNT TEMPLATE
, Align the template with the marks on the ceiling
and tape in place.
- Be sure the template
is oriented correctlg with the
front of the hood.
, Use a plumb bob to be sure the mounting
holes
will provide parallel alignment with the countertop
below.
, Center punch all hole locations.
, Drill pilot holes in the 4 screw locations. Use a 3/16"
bit and drill approximatelg
1-1/2" deep.
, Drive 4 hex head wood screws into the center of
the ceiling joists and cross framing.
Leave a 1/4"
gap to allow the screw head to engage the keghole
slots on the support frames.
, Cut the 8-1/2" duct opening through the sheet rock.
.J
_-
• .......J
STEP 21 ADJUST FRAME HEIGHT
,Measure
exact ceiling height.
, Find the exact frame height
required on the chart on page 6.
, Remove 2 screws on each of the
4 sides of the frame to loosen the
upper structure,
lower structure
and blower/motor.
,Adjust
the height "X', according to
the chart on page 6. Use a total of
32 screws (8 screws on each side)
to secure the upper structure,
lower structure and blower/
motor together.
2-3/4'-
24" min.
30" max.
Ceiling
heii ht
o
o
o°m
o
o
o
o_
Eo
o
o
<_
°o
° o
o
o
o
o
o
o
o
o
o
o
o
o
o
_i
__
rl
°o
°o
o
o
Oo
o
o
o
_20
_
o
12

Advertisement

Table of Contents
loading

Table of Contents