Step 11 Install Lower Duct Cover; Step 12 Install Duct Cover Trim; Step 13 Install Metal Filter; Step 14 Finalize Installation - Monogram ZV925 Installation Instructions Manual

36" island chimney vent hood
Table of Contents

Advertisement

STEP 11 INSTALL LOWER DUCT COVER

Front bottom duct cover section
(snap into place and secure
with 6 screws – 3 per side)
Plan diagram
top view
• Place rear duct cover onto the hood.
• Place front duct cover onto the hood.
• Secure the duct covers with 6 screws.
Installation Instructions
Front bottom duct
cover sections
17

STEP 12 INSTALL DUCT COVER TRIM

Upper
Side
trim
bracket
strip
Lower
trim strip
• Install side brackets to secure the lower duct
tightly against the upper duct.
• Hold lower trim strips (narrow pieces) with hooks
facing down. Place the hooks inside the slots and
slide downward.
• Select the correct size upper trim strips and press
into place.

STEP 13 INSTALL METAL FILTER

IMPORTANT: Check to be sure that the main ON/
OFF switch next to the motor is in the ON
position.
Filter lock
• Tip the filter into the left or right side of the
opening. Lift the filter to the opposite side and
into the filter lock.
• To remove the filter, pull the filter lock downward.

STEP 14 FINALIZE INSTALLATION

• Remove all tape and packing material.
• Refer to the Owner's Manual for operating instructions.
Upper
trim
strip
Lower
trim
strip

Advertisement

Table of Contents
loading

Table of Contents