Step 4 Mount Template; Step 5 Install Support Frame - Monogram ZV1050 Installation Instructions Manual

42" island
Hide thumbs Also See for ZV1050:
Table of Contents

Advertisement

STEP 4 MOUNT TEMPLATE

• Align the template with the marks on the ceiling and tape
in place.
– Be sure the template is oriented correctly, with the front
of the hood.
• Use a plumb bob to be sure the mounting holes will pro-
vide parallel alignment with the countertop below.
• Center-punch all hole locations.
• Drill pilot holes in the 4 screw locations. Use a 5/32" bit
and drill approximately 1-1/2" deep.
• Cut the 8-1/4" duct opening and approximately 1" wire
access hole.

STEP 5 INSTALL SUPPORT FRAME

Install upper support frame
• Secure the upper support frame to the ceiling joists
and cross-framing with the 4 lag screws provided. For
maximum rigidity and strength, the screws must be
driven into the center of the joists and/or cross- framing.
Check to be sure the support frame is level, vertically
and horizontally.
Installation Instructions
11
Wire Access Holes
Hood
Mounting
Flange
30" Recommended
Install lower support frame
• Insert lower support frame (or accessory support frame,
ZX1059SFSS or ZX10510SFSS) into the upper support
frame and loosely secure with 8 screws and washers (4
on the front and 4 on the back sides).
• Adjust the lower support frame up or down to the
desired height above the countertop. Tighten screws.
IMPORTANT: Again, check to be sure the support is level in
both directions. There is no way to level the hood after the
hood is secured to the frame.
Lower Support
10"
40"
76"
Countertop

Advertisement

Table of Contents
loading

Table of Contents