Installing The Power Unit - Yamaha F2.5A Service Manual

Hide thumbs Also See for F2.5A:
Table of Contents

Advertisement

Thermostat cover bolt N:
8 N·m (0.8 kgf·m, 5.9 ft·lb)

Installing the power unit

1. Clean the power unit mating surfaces,
and then install the dowels 1 and the
new gasket 2.
2. Install the power unit 3 by installing the
bolts 4, and then tighten them to the
specified torque.
CAUTION:
Do not reuse the power unit gasket,
always replace it with a new one.
Power unit bolt 4:
11 N·m (1.1 kgf·m, 8.1 ft·lb)
3. Install bottom cowling 1 5, bottom cowl-
ing 2 6, and the carrying handle 7.
69M3E11
4. Install the Woodruff key 8.
Cylinder block
1
2
3
4
5
6
7
8
9
5-36

Advertisement

Table of Contents
loading

Table of Contents