Mitsubishi 4G1 Service Manual page 192

1992-1993
Hide thumbs Also See for 4G1:
Table of Contents

Advertisement

Division = 1 mm LO4 in.)
Notch
TSB Revision
(2) While lightly pushing down the inner steel ball using a small
wire, move the plunger up and down four or five times to
bleed air.
Use of the retainer facilitates the air bleeding of a rocker
arm mounted type lash adjuster.
(3) Remove the small wire and press the plunger. If the plunger
is hard to be pushed in, the lash adjuster is normal. If the
plunger can be pushed in all the way readily, bleed the lash
adjuster again and test again. If the plunger is still loose,
replace the lash adjuster.
Caution
Upon completion of air bleeding, hold the lash adjuster
upright to prevent inside diesel fuel from spilling.
(4) After air bleeding, set the lash adjuster on the special tool
(Leak down tester MD998440).
(5) After the plunger has gone down somewhat (.2 - .5 mm),
measure time taken for it to go down 1 mm. Replace if the
measured time is out of the specification.
Standard value: 4 -
[Diesel fuel at 15 - 20°C (59 - 68"F)]
INSTALLATION SERVICE POINTS
CAMSHAFT IDENTIFICATION
Identification:
E X P O / GALANT A R
TRUCK
ROCKER SHAFT INSTALLATION
the notch on the shaft facing up, and insert the installation
bolt without tightening it.
seconds / 1 mm (.04 in.)
20
'I

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4g34g64g96g7

Table of Contents