8

Reports

8.1

Start-up report

Please check off the start-up tasks carried out and enter
the corresponding readings.
Initial start-up tasks
1.
Note down gas characteristics:
Wobbe-index
Operating heat value
2.
Inspect to check for leaks
(See section 2.1.2 on page 23)
3.
Check combustion air/flue gas connection
(See section 2.1.4 on page 24)
4.
Checking the boiler equipment (change to another type of gas if
necessary) (See section 2.1.5 on page 25)
5.
Carry out adjustment settings
(See section 2.1.8 on page 26)
6.
Measure the gas connection pressure (flow pressure)
(See section 2.1.11 on page 27)
7.
Checking and adjusting the gas/air -ratio
CO
-content:
at full load
2
at part load
(See section 2.1.12 on page 27)
8.
Leak test in operational condition
9.
Measure carbon monoxide content (CO), vacuum
(See section 2.1.14 on page 28)
10. Function testing
Measuring the ionisation current
(See section 2.1.15 on page 28)
11. Fit the boiler casing
12. Instruct the user. Fill in Benchmark log book.
Hand over documentation.
(See section 2.1.16 on page 29)
13. Confirm initial start-up
Confirmation of initial start-up by qualified service technician
(Company stamp, signature)
Subject to modifications resulting from technical improvements!
Installation and maintenance instructions for wall-mounted condensing gas boiler 600 - 11S/19S/24S/24C • 02/2006
Remarks or measurement readings
_____________________ kWh/m
_____________________ kWh/m
_____________________ mbar
_____________________ Pa
_____________________ %
_____________________ %
_____________________ ppm
_____________________ µA