Buderus 600 - 11S Installation And Maintenance Instructions Manual page 68

Hide thumbs Also See for 600 - 11S:
Table of Contents

Advertisement

8
Reports
Requirement-related maintenance tasks
1. Clean heat exchanger, burner and condensate trap
(See section 4.1 on page 31)
2. Check and adjust the gas-air ratio
CO
-content:
2
(See section 2.1.12 on page 27)
3. Confirm servicing work
Confirmation of servicing carried out by qualified technician
Company stamp, signature)
Buderus • http://www.buderus-domestic.co.uk
68
Installation and maintenance instructions for wall-mounted condensing gas boiler 600 - 11S/19S/24S/24C • 02/2006
at full load
at part load
Date: _____________
Pa
______________________
%
______________________
%
______________________
Subject to modifications resulting from technical improvements!
Date: _____________
Pa
______________________
%
______________________
%
______________________

Advertisement

Table of Contents
loading

Table of Contents