Invacare Typhoon II Service Manual page 24

Invacare typhoon ii wheelchair service manual
Hide thumbs Also See for Typhoon II:
Table of Contents

Advertisement

7.1.1.2
Removing wheel rim and tyres on vehicle with puncture-proof tyres
CAUTION!
Danger of damage to motor if the bolts are not loosened and removed in the prescribed
sequence!
• Only ever loosen and remove the bolts in the prescribed sequence!
Bolts 1 to 5 must be loosened and removed in a
prescribed sequence. The numbering of the bolts
is not fixed, in other words there is no particular
bolt permanently numbered "1". What is really
meant is that the operation can start with any
bolt. This is then "number 1". "Number 2" is then
the next bolt in a clockwise direction, "3" the next
one and so on.
Loosen and remove bolts 1 and 3 using the
6 mm Allen key.
Now unscrew bolts 2, 4 and 5 by one turn in
a clockwise direction one after the other until
all are loosened and removed.
Remove the wheel rim halves, the tyre and
the puncture-proof inner tube from the
wheel.
7.1.1.3
Continuing dismounting the motor
Open the circlip (1) securing the top bolt
using the circlip pliers and remove it.
Loosen and remove the bolt (1) using the 5 mm
Allen key, then loosen bolt (2).
24

Advertisement

Table of Contents
loading

Table of Contents