8. To install the FAStT900 Storage Server into a rack cabinet in the new location,
perform the following steps:
a. Slide the FAStT900 Storage Server into the rack cabinet.
b. Insert and tighten two of the screws that you removed in Step 5 on the
inside front of the FAStT900 Storage Server.
c. Insert and tighten the remaining two screws that you removed in Step 5 on
the inside rear of the FAStT900 Storage Server.
9. Replace all CRUs in the FAStT900 Storage Server.
10. Connect the interface cables and host Fibre Channel cables that you labeled in
Step 3 on page 34.
11. Connect the remaining cables to the FAStT900 Storage Server.
12. Turn on power to the FAStT900 Storage Server. Use the procedure in "Turning
on the power" on page 17.
13. Replace the FAStT900 Storage Server bezel.