Checking The Battery Service Date; Preparing To Move The Fastt900 Storage Server - IBM TotalStorageFAStT900 User Manual

Fibre channel storage server
Table of Contents

Advertisement

2. Check the Battery Support Information label, as shown in Figure 32.
Figure 32. Checking the battery service date
3. Perform one of the following tasks:

Preparing to move the FAStT900 Storage Server

Remove each component CRU before you move the FAStT900 Storage Server to a
new location or before you remove the chassis from its rack cabinet. This
precaution helps safeguard the equipment and ensures a smoother transition to the
new environment.
If you are moving the FAStT900 Storage Server a short distance, and you have
sufficient assistance or equipment, you might be able to move the FAStT900
Storage Server without removing each component CRU. If you do not have
sufficient assistance or equipment, use the procedure in "Moving or relocating the
FAStT900 Storage Server" on page 34 to safely move the equipment to its new
location.
If you are moving the FAStT900 Storage Server a significant distance, be sure to
pack it in its original shipping container.
The Battery Support Information label on the front of the battery has three
dates:
v Date of Manufacture - Date the battery was built at the factory
v Date of Installation - Date the battery was installed in the FAStT900 Storage
Server
v Replacement Date - Battery replacement date (see the note at the beginning
of this section)
v If it is time to replace the battery, install a new battery using the procedure
described in "Replacing a failed battery" on page 41.
v If it is not time to replace the battery, replace the FAStT900 Storage Server
bezel, as shown in Figure 22 on page 17.
Chapter 2. Operating the FAStT900 Storage Server
33

Advertisement

Table of Contents
loading

Table of Contents