Mechanical Adjustments - Daewoo TVZ 1321 Service Manual

Tv/vcr in one board, chassis : cn-140 ntsc-m system
Table of Contents

Advertisement

MECHANICAL ADJUSTMENTS

Tape Path Alignment Procedures
The tape transporting system is precisely aligned at the factory and under the normal circumstances will not require adjust-
ment. However, if noise appears in the playback picture, it can be considered that the tape damage has occurred or the
tape path has changed, readjustment of the tape path is necessary.
ADJUSTMENT FLOW FOR THE TAPE TRANSPORTING SYSTEM
CHANGE
• DRUM TOTAL ASS'Y
• A/C HEAD ASS'Y
• PINCH LEVER
TOTAL ASS'Y
CHANGE
• S-POLE BASE ASS'Y
• T-POLE BASE ASS'Y
• TENSION LEVER
ASS'Y
CLEANING
PATH ROUGH ADJ.
PATH PRE-ADJ.
LINEARITY ADJ.
AUDIO ADJ.
X-POSITION ADJ.
TRACKING
Table. 8 Flow Chart of Tape Path Alignment
22
S GUIDE ROLLER HEIGHT ADJ.
S GUIDE POST FLANGE
T GUIDE ROLLER HEIGHT ADJ.
A/C HEAD HEIGHT ADJ.
PG(PHASE GENERATOR)
ENTRANCE ENVELOPE
EXIT ENVELOPE WAVEFORM
ENTRANCE & EXIT ENVELOPE
WAVEFORM FINE ADJ,
• X-POSITION ROUGH ADJ.
• ENTRANCE & EXIT ENVELOPE
WAVEFORM FINE ADJ.
• REVIEW ¤APLAY
AUDIO TILT, HEIGHT
AZIMUTH ADJ.
SP, EP

Advertisement

Table of Contents
loading

Table of Contents