Daewoo TVZ 1321 Service Manual page 14

Tv/vcr in one board, chassis : cn-140 ntsc-m system
Table of Contents

Advertisement

4. General removal view
Front Loading Mechanism Removal
NOTE :
The front loading mechanism must be in the eject position
to remove it.
1. Remove two (2) screw holding the Front Loading Mech-
anism.
2. Lift the rear of the cassette loading mechanism (hole
Fig. 12- Front Loading Mechanism Removal
parts for screw) to separate it from the Main Base.
Front Loading Mechanism disassembly
(Fig. 13~17)
1. Remove the front loading mechanism.
2. Remove one(1) screw holding the F/L bracket R and
move the F/L bracket R in the direction of arrow to sep-
arate it from the top plate and the cassette holder
Fig. 13- Front loading mechanism disassembly
assembly.
3. Remove the cassette holder assembly (Fig. 13)
(Fig. 12)
4. Remove the prism cap and remove one (1) screw hold-
Fig. 14- F/L Brkt Disassembly
ing the prism link R and remove the prism link R from the
F/L bracket R (Fig. 4)
Fig. 15- Top Plate Disassembly
5. Remove one (1) screw holding the prism link L (Fig. 15).
6. Release hook B by pushing it in the direction of the
arrow and remove the door opener (Fig. 15).
7. Press the linked section of the loading lever assembly in
the direction of the arrow and remove the loading lever
assembly (Fig. 16)
8. Remove the safety spring between the safety lever and
the cassette holder (Fig. 16)
9. Remove the release spring between the release lever
and the safety lever R (Fig. 16)
12

Advertisement

Table of Contents
loading

Table of Contents