Rinnai Arriva Operation And Installation Manual page 36

Hide thumbs Also See for Arriva:
Table of Contents

Advertisement

Installation - Arriva Commissioning
Burner pressures given below are correct at the time of printing and should always be checked
against values on the data plate.
Gas Type
Flue
Pressure (Pressure
Pilot
Balance kPa)
PL
PF
PA
PH
Primary gas pressure (minimum) NG 1.5 kPa, LPG 2.75 kPa
Test Point Positions
Checking
1. Remove combustion chamber glass front assembly and the plastic
supply
pressure
2. Attach positive pressure hose on the manometer to the glass inlet test
3. Replace combustion chamber glass front assembly. Make sure there is a
4. Press the On/Off button to check inlet pressure when all the burners
rinnai new Zealand Limited
NG
Direct
Extended
0.980
0.980
0.206
0.206
0.666
0.666
0.294
0.294
0.745
0.588
Gas control test point
Gas inlet test point
Combustion chamber
test point
Pilot test point
control panel cover.
point.
good seal around the edge of the chamber by squeezing tape all the way
around the edge. Take care not to bunch the tape in the corners.
start operating.
LPG
Direct
Extended
1.960
1.960
0.667
0.667
2.068
2.068
0.843
0.843
2.078
1.646
Control Panel Positions
test button
dip switch
Set button
Arriva Operation and Installation Manual: 10343-E
36
Propane
Direct
Extended
1.960
1.960
0.667
0.667
2.068
2.068
0.843
0.843
2.078
1.646
For direct flue
For extended flue
05-10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents