SUPP OR T IN G A S T H M A CA RE Appliance must be installed with an approved Rinnai flue system. Appliance must be installed, commissioned and serviced by a licensed tradesperson in accordance with these instructions and all applicable local rules and regulations.
3 below, rinnai new Zealand Limited supervising gas fitter’s registration number (“Rinnai”) will, at its own discretion, either and the gas fitting certification number. replace or repair any defective product at 4. This warranty commences from the date of no charge to the customer.
Front Fascia and Top Panel Wiring diagrams Commissioning Checklist Installer details Customer Contacts WARNING Improper installation, adjustment, alteration, service or maintenance can cause property damage, personal injury or loss of life. For assistance or additional information contact Rinnai on 0800 RINNAI (0800 746 624).
The operation section of this manual has been written to: • Highlight the safe operation and positioning of this appliance • Advise on maintenance, servicing and troubleshooting to ensure optimum performance rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
This may be amplified if the air contains cooking vapours or cigarette smoke. To avoid this occurring, it is recommended that a mat be placed in front of the appliance. rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
25 mm. For additional depth, 25 mm of horizontal clearance is required for every 25 mm of added depth. Refer surround diagram below. Angled for free flow clearance for room air return rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
If the supply cord is damaged and requires replacing, it must be replaced by a licensed tradesperson. This must be a genuine replacement part available from Rinnai. Hearths A hearth is not necessary but can be used for decorative purposes or protection of sensitive flooring if required.
Arriva has a fan that distributes warm air at a low level, this pushes the heat out and around the room as opposed to straight up. The Arriva also has a power flue that has virtually zero clearance to any cavity in which it is installed.
As a result the combustion fan about ignition starts several seconds before there are any signs of the Arriva starting. The normal ignition sequence is: 1. When the On/Off button is pressed the LED will glow red and the combustion fan starts to purge the system.
Page 11
Should the room temperature exceed 40 °C while the flame function is activated, the heater will switch off automatically. This is a safety feature. rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
L (Low) continuous combustion on low • 16 °C ~ 26 °C (in 1 °C steps) combustion rate varies to maintain selected temperature • H (High) continuous combustion on high rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Page 13
To turn the timers off, press the relevant timer button again. The heater will return to standby mode. If there are no timers set the Timer indicator will go out. After battery replacement the clock and timers may need to be re-programmed. rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Page 14
Standby only. Temperature Time Clock The remote control will show ‘Lock. Timer 1 Set ON OFF Timer 2 Set ON OFF To cancel, hold the Lock button for 3 seconds. rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Clean any dust or debris from both sides of the filters using a vacuum strips cleaner, a soft dry cloth or a soft brush. NEVER attempt to clean the filters with water. rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Page 16
2. Clean the filters as outlined in these instructions. 3. Press the On/Off button to turn the heater back on. 4. Use remote control to resume normal operation. rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Rinnai has a service and spare parts network with personnel who are fully trained and equipped to give the best advice on your Rinnai appliance. If your appliance needs servicing, please call Rinnai (0800 746 624) from a land line and select option 1 for a service centre in your area.
Abnormal Flame Pattern Each Rinnai Flame Fire has a distinct flame pattern. This should look the same every time you start your fire, after an initial warm up period of approximately 20 minutes. Abnormal flame performance and/or pattern can indicate a problem with your fire, such as blocked gas injectors or artificial logs/burn media have shifted from when the fire was first installed.
Arriva are a normal part of operation. If you are still unsure or concerned after reading this section, please contact Rinnai. Ignition may not occur the first time it is operated due to air in the gas Using the pipes.
Page 20
Flat batteries replace remote control batteries remote control Press the Standby/On lock-up due to button signal being out or range, incorrectly aimed or obstructed rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Your Arriva heater is fitted with self diagnostic electronics that monitor the appliance during start up and operation. Should a fault occur the heater will shut down. The fault that has caused the shut down will be indicated by a pair of flashing digits in the error display window and a green flashing operation indicator.
Arriva Accessories Rinnai offers 4 distinctly styled fronts. These interchangeable fronts allow the Arriva to be tailored to suit the style of your interior. A continuous sweep of curved glass. Arriva Plasma Fascia Arriva Midnight A continuous arc of glossy black glass.
Read these instructions to get an overview of the steps required before starting the installation. Failure to follow these instructions could cause a malfunction of the appliance. This could result in serious injury and property damage. rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Page 24
Balanced flue, inner = 50 mm, outer 75 mm Flue must be terminated to the atmosphere in accordance with NZS 5261. Rinnai warranty conditions will be voided if non Rinnai flue components are fitted. This heater is only certified for use with approved Rinnai Arriva flueing components.
In some cases curtains may need restraining. the rinnai Arriva has a cool outer casing, it can be installed into an existing Enclosure masonry or decorative fireplace.
Direct flue Centreline of enclosure installations, where the flue terminal is to be terminated directly to the rear of the appliance. Gas supply penetration Ø 85~95 rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Flueing - General For all installations an Rinnai Arriva flue system MUST BE used. Flue system must be fully assembled and secured in place before the heater is installed. IMPORTANT Must be compliant with ‘Clearances Required for Flue Flue terminal Terminals’...
Page 28
Flueing - Types of Flue Installations Refer Flue Installation manual provided with the Arriva Direct and Adaption Flue kits for detailed flue installation instructions. NOTE Flue is run direct from appliance to the termination point either in a Direct flueing horizontal or vertical direction.
Page 29
Used to terminate flue pipe in Protection against hot flue gases horizontal flue terminations when when the flue terminates low to used with Arriva Adaption Flue Kit the ground. rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Page 30
500 mm to allow the flue pipe to clear the base of the appliance. Appliance needs to be down rated, refer data plate. rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
4. Securely connect flexible gas connection to the gas pipe, testing all connections for gas leaks. 5. Replace right hand panel and secure screws into place. rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Failure to secure the flue system using the supplied clamps may result in a dangerous situation. Arriva Adaption Flue Kit Arriva Direct Flue Kit Clamp Direct A & B flues Clamp Flue pipe rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Page 33
Secure the heater body through these points using appropriate fixings. Mounting points Flue spigot and The Rinnai Arriva flueing system must be installed in accordance with the air inlet hose instructions supplied. Once the flue and air connections are secured slide the flue access panel Flue access back into position and fasten.
Page 34
Left hand top log bottom log 3. Place the rear main log into the combustion chamber on the rear location pins. rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
6. Place the left hand bottom log into the combustion chamber so it hides the flame sensor rod from view. Place the right hand bottom log on the opposite side. 7. Replace combustion chamber glass panel and secure in place with the 2 retaining screws. rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Page 36
Take care not to bunch the tape in the corners. 4. Press the On/Off button to check inlet pressure when all the burners start operating. rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
10. Press the On/Off button to turn the heater off. 11. Commissioning is now complete. Remove manometer, replace test point screws and replace plastic control panel cover. rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Repeatedly adjust the vanes more than 5 times as this may cause the metal to fracture and/or break • Attempt to adjust the air flow direction while the appliance is operating or still hot as this can result in a burn injury rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Secure the fascia to the appliance body with 2 retaining screws through the front of the warm air discharge louvre. Installing the Push the top panel down into place and secure with screws provided. top panel rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Wiring diagram Mark Colour Black Blue gr/y Yellow - Green Stripe Grey Orange Purple White yellow rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Page 41
Pilot Burner FR1~4 Flame Rods 1~4 Front Burner remote Controller REARB Rear Burner Convection Fan REARB (L) Rear Burner Left Convection Fan Motor REARB(R) Rear Burner Right Sparker rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...
Appliance positioned in a suitable location? (i.e. clearances, combustibles etc.) Was a Rinnai approved flue system installed and is the flue drawing effectively? Down rated (if applicable) according to data plate instructions? Has specified gas pressures been checked and set?
Installer details Company name:______________________________________________________________ Installer name:_______________________________________________________________ Address:____________________________________________________________________ ___________________________________________________________________________ Phone:_______________________________ Mobile:______________________________ Certificate of Compliance number for installation:____________________________________ Signed:______________________________ Date:_______________________________ rinnai new Zealand Limited Arriva Operation and Installation Manual: 10343-E 05-10...