Steps For Finalizing The Installation - Travis Industries 31 DVI GSB2 Owner's Manual

Direct vent fireplace insert
Table of Contents

Advertisement

Steps for Finalizing the Installation

1.
Remove the glass (see page 21).
NOTE:
If using propane (LP) convert the appliance prior to installing the media.
2.
We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected
once it enters the firebox, ensuring gas does not build up.
3.
Install the four AA batteries (included in the owner's pack) into battery holder (see the illustration below). The AA
batteries act as a power backup in case the household (AC) power goes out and are required for operation.
Install the 9v battery (included in the owner's pack) into control panel light assembly (see the illustration below).
The battery holder is held in place with Velcro and may be removed for easier access.
4.
Install the media (and firebacks, if applicable).
5.
Replace the glass.
6.
Start the heater.
7.
Leak test all gas joints.
© Travis Industries
Finalizing the Installation
Swing the access door and
control cover down to access
the controls on the insert.
AA Battery Tray
4140813
Battery for Control
Panel Lights
AA
Battery
Holder
23
100-01296

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents