F Lue Draft C Onsiderations; Enting Systems; Tools And Supplies Needed; Inspect Appliance & Components And Pre-Burn Check List - Quadra-Fire Isle Royale 823-0170-MBK Owner's Manual

Non-catalytic, top-load, wood heater installation and operation
Hide thumbs Also See for Isle Royale 823-0170-MBK:
Table of Contents

Advertisement

D. F lue Draft Cons iderations
Location of the appliance and chimney will affect perfor-
mance. As shown in F igure 6 . 1 on page 6 the chimney
should:
• Be installed through the warm space enclosed by the
building envelope. T his helps to produce more draft,
especially during lighting and die down of the fire.
• Penetrate the highest part of the roof. This minimizes
the affects of wind turbulence and down drafts.
• Consider the appliance location in order to avoid
floor and ceiling attic joists and rafters.
E x terior conditions such as roof line, surrounding trees,
prevailing winds and nearby hills can influence stove
performance. Your local dealer is the expert in your geographic
area and can usually mak e suggestions or discover solutions
that will easily correct your flue problem.
T o be sure that your appliance burns properly, the chimney
draft ( static pressure) should be approx imately - .0 4 inch water
column ( W .C .) during a low burn and - .1 0 inch W .C . during a
high burn, measured 6 inches ( 1 5 2 mm) above the top of the
appliance after one hour of operation at each burn setting.
NOTE: T hese are guidelines only, and may vary somewhat
for individual installations.
E. Venting Sys tems
T he venting system consists of a chimney connector ( also
k n own as stove pipe) and a chimney. T hese get ex t remely
hot during use. T emperatures inside the chimney may
ex c e ed 2 0 0 0 °F ( 1 1 0 0 °C) in the event of a creosote fire. To
protect against the possibility of a house fire, the chimney
connector and chimney mus t b e properly ins talled and
maintained. An approved thimble must be used when a
connection is made through a combustible wall to a chimney.
A chimney support package must be used when a connection
is made through the ceiling to a prefabricated chimney.
T hese accessories are ab s olutely neces s ary to provide
safe clearances to combustible wall and ceiling material.
F ollow venting manufacturer' s clearances when installing
venting system.
As phyx iation Ris k .
DO NOT CONNECT THIS UNIT TO A CHIM-
NEY FLUE SERVICING ANOTHER APPLI-
ANCE.
• DO NOT CONNECT TO ANY AIR DISTRIBU-
TION DUCT OR SYSTEM.
May allow flue gases to enter the house.
M arch 2 1 , 2 0 1 3
Is le Royale Wood Stov e
WARNING
F . Tools And Supplies Needed
B efore beginning the installation be sure that the following
tools and building supplies are available.
Reciprocating saw
P liers
H ammer
P hillips H ead Screwdriver
F lat B lade Screwdriver
Plumb Line
Level
T ape M easure
G . Ins pect Appliance & Components and
P re- B urn Check Lis t
1 .
Place the appliance in a location near the final
installation area and follow the procedures below:
2 .
O pen the appliance and remove all the parts and
articles pac k ed inside the C omponent P ac k . Inspect
all the parts and glass for shipping damage. C ontact
your dealer if any irregularities are noticed.
3 .
All safety warnings have been read and followed.
4 .
T his O wner' s M anual has been read.
5 .
F loor protection req uirements have been met.
6 .
V enting is properly installed.
7 .
T he proper clearances from the appliance and
chimney to combustible materials have been met.
8 .
T he masonry chimney is inspected by a professional
and is clean, or the factory built metal chimney is
installed according to the manufacturer' s instruc-
tions and clearances.
9 .
T he chimney meets the req uired minimum height.
1 0 .
All labels have been removed from the glass door.
1 1 .
A power outlet is available nearby if installing
optional blower assembly.
F ire Ris k .
Inspect appliance and components for damage.
Damaged parts may impair safe operation.
• Do NOT install damaged components.
• Do NOT install incomplete components.
• Do NOT install substitute components.
Report damaged parts to dealer.
2 5 0 - 5 7 6 3 F
F raming M aterial
H i- T emp C aulk i ng M aterial
G loves
F raming Sq uare
Electric Drill & Bits (1/4")
Safety G lasses
1 /2 in. - 3 /4 in. length, # 6 or
# 8 self drilling screws ( need 3
per pipe section connection)
WARNING
R
P age 7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isle royale 823-0290-pmh

Table of Contents