EGR VALVE INSPECTION
Operation Test
1. Carry out the EGR Control Inspection. (See
• If not as specified, perform the further inspection for the EGR valve.
Resistance Inspection
Note
• Perform the following test only when directed.
1. Disconnect the negative battery cable.
2. Inspect resistance of the EGR valve coils.
• If not as specified, replace the EGR valve.
• If as specified, carry out the Circuit Open/
Short Inspection.
Terminals
CE
CA
DB
DF
Circuit Open/Short Inspection
1. Disconnect the PCM connector. (See
2. Inspect the following wiring harness for open or
short (continuity check).
Open circuit
• If there is no continuity, the circuit is open.
Repair or replace the harness.
EGR valve terminal E (harness-side) and
PCM terminal 4E
EGR valve terminal A (harness-side) and
PCM terminal 4H
EGR valve terminal B (harness-side) and
PCM terminal 4K
EGR valve terminal F (harness-side) and
PCM terminal 4N
EGR valve terminal C or D (harness-side)
and main relay terminal C (harness-side)
Short circuit
• If there is continuity, the circuit is shorted. Repair or replace the harness.
EGR valve terminal E (harness-side) and GND
EGR valve terminal A (harness-side) and GND
EGR valve terminal B (harness-side) and GND
EGR valve terminal F (harness-side) and GND
EGR valve terminal C or D (harness-side) and power supply
3. Remove the EGR valve, and inspect for any damage or clogging.
• If there is no damage or no clogging, replace the EGR valve.
End Of Sie
F40
EMISSION SYSTEM
F233 EGR Control System
Resistance (ohms)
1216
F43 PCM
REMOVAL/INSTALLATION.)
Inspection.
A6E391620300W02
A6E3916W009
A6E3916W011
A6E3916W010