Heat & Glo SL-550TR-E Owner's Manual page 48

Fireplaces
Hide thumbs Also See for SL-550TR-E:
Table of Contents

Advertisement

Step 5. Fold bottom fl ap along score line as indicated in
Figure 11.11 and tuck into valve access area of appliance.
Splatter guard should fi t securely on front of unit.
Figure 11.11
Figure 11.12
Step 6. To open lower access panel of splatter guard,
place one hand above score line and place two fi ngers
from other hand in the round holes on the front of the
splatter guard. See Figure 11.12 Pull out and fold up
the panel as shown in Figure 11.13. Disengage the tabs
on left and right bottom of splatter guard and fi t them into
the square holes. The tabs are now inside the front of
the splatter guard; carefully bend them down See Figure
11.14.
Figure 11.13
48
Heat & Glo • SL-550 / 750 / 950TR-E • 2118-900 Rev. D • 6/07
Figure 11.14
Once plumbing and wiring are complete on the fi replace,
the lower access panel may be closed until the time that the
splatter guard must be removed for fi ring the appliance.
Figure 11.15
To Close the Lower Access Panel:
Carefully disengage the tabs from the square holes and
bend the access panel to its original position. Bend the
center bottom fl ap and insert it into the bottom of the ap-
pliance.
Figure 11.16
To Remove the Splatter Guard:
Carefully grab splatter guard on or near the vertical center
on the left and right sides. Pull outward gently, but fi rmly,
taking care not to tear or remove the inserted tabs.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents