Step 2 Framing The Fireplace - Heat & Glo PIER-TVFL-IPI Owner's Manual

Table of Contents

Advertisement

Step 2
Framing the
Fireplace
CAUTION
PIER-TVFL-IPI
Figure 4. Framing Dimensions
12
Heat & Glo • PIER-TVFL, ST-42TVFL-IPI • 455-901 Rev. F • 8/05
Minimum Clearances from the B-Type Vent Pipe
to Combustible Materials is 1 inch (25 mm) all
around the pipe.
Fireplace framing can be built before or after the
fireplace is set in place. Framing should be
positioned to accommodate wall coverings and
fireplace facing material. The diagram below shows
framing reference dimensions.
MEASURE FIREPLACE DIMENSIONS, AND
VERIFY FRAMING METHODS AND WALL
COVERING DETAILS, BEFORE FRAMING
CONSTRUCTION BEGINS.
FRAMING
HEADERS
A
B
MODEL
PIER-TVFL-IPI
ST-42TVFL-IPI
Dimensions shown in inches.
C
A
A
B
C
40
23
41
1/4
1/4
1/2
44
23
41
1/4
1/2
ST-42TVFL-IPI
C
B