Epson Stylus CX3100 Service Manual page 51

Hide thumbs Also See for Stylus CX3100:
Table of Contents

Advertisement

EPSON Stylus CX3100/3200
6.
Release the motor lead wires from the fastening portion of the Holder Shaft Unit.
Figure 4-32. Releasing the Motor Lead Wires
7.
While holding the motor, remove the four hexagon nuts (M3) securing the motor to the
mechanism.
Figure 4-33. Removing the CR Motor
Disassembly and Assembly
When installing the CR Motor, pay attention to the following
C A U T I O N
particulars:
Connect the motor lead wires to the connector (CN14) on the
Main Board.
Tighten the hexagon nuts in the numeric order shown below.
NOTE: Screw tightening torque: 0.5-0.7Nm
Check that the motor is secured properly.
Once the CR Motor has been removed or replaced, make
A D J U S T M E N T
R E Q U I R E D
adjustments in the order specified below:
1.
Bi-D Adjustment (See p.63)
2.
First Dot Position Adjustment (See p.67)
CR
Disassembly of Printer
Revision A
1
4
2
3
51

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stylus cx3200

Table of Contents