Fitting The Water Connections; Fitting The B-Kit - Buderus Logano G115 WS US/CA Installation And Service Instructions Manual

Low-temperature oil boiler
Hide thumbs Also See for Logano G115 WS US/CA:
Table of Contents

Advertisement

5.2

Fitting the water connections

Caution: Risk of system damage from leak-
ing connections.
V Support the pipes to the boiler to prevent
them from being under stress.
5.2.1

Fitting the B-kit

The safety relief valve and the pressure/temperature
gauge are mounted on the supply manifold (included in B-
Kit) on the VK boiler supply connection as follows:
V Fit and seal unmarked end of double nipple into con-
nection VK on the boiler.
V Converter is paint-marked pink and stamped with the
designation NPT on the end with the 1¼" NPT thread.
V Seal 90° 1¼" NPT street elbow on double nipple.
V Fit and seal manifold to 90° elbow. The manifold can
face in different directions (
Do not fit the safety valve until the leak test
(
Chapter 5.3, page 21) has been com-
pleted.
The relief valve must be installed in a vertical
position.
V Seal pressure/temperature gauge to supply manifold.
We recommend installing a dirt filter (option-
al) in the boiler return connection to reduce
build-up of debris on the water side.
Logano G115 WS US/CA - Technical specifications are subject to change without prior notice.
Fig. 14).
Fig. 13 Checking thread length on double nipple
Fig. 14 Installing B-Kit
1
90° 1¼" NPT street elbow
2
Double nipple
3
Supply manifold
4
Pressure/temperature gauge
5
Pressure relief valve
6
90° ¾" NPT elbow
Installing the boiler
5
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logano g115/3 wsLogano g115/4 wsLogano g115/5 ws

Table of Contents