8
Actions
8
Actions
8.1
Testing, measuring, adjusting and replacing
various components
8.1.1
Checking the UBA 3 fuse; replace if necessary
Switch off the power supply of the heating system on the circuit
breaker.
Set the main switch on the BC10 to "0" (Off).
Remove the casing.
Loosen the fastening screw of the UBA 3 by turning it counter-
clockwise (see fig. 4, pos. 1).
WARNING!
Do not pull or move side to side the UBA 3
during loosening or tightening of UBA 3 fastening
screw.
Remove the UBA 3 once the fastening screw is fully loosened
by pulling it forward carefully as indicated by the arrow (see
fig. 4, pos. 2).
Dismantle the fuse holder by loosening the bayonet connector
(see fig. 5, pos. 1).
Remove the fuse from the fuse holder.
Check the circuit continuity through the fuse using the volt-ohm-
multimeter. If broken, replace it by (a new) spare ceramic fuse
5 amps, 250V fast blow (F5AH, 250V) (fig. 5, pos. 2).
Re-assemble the UBA 3 in reverse order of disassembly.
Fasten the UBA 3 by only turning the fastening screw clock-
wise.
WARNING!
Do not push or force the UBA 3 in place by hand.
Fit the casing.
Switch on the power supply of the heating system on the circuit
breaker.
Set the main switch on the BC10 to "1" (On).
84
Logamax plus GB142-24/30/45/60 - We reserve the right to make any changes due to technical modifications!
2
1
fig. 4
Dismantling the UBA 3
1
fig. 5
Checking the fuses
2