Pre-Start-Up; Check For Refrigerant Leaks; I1. Start-Up Cooling Section And - Payne PA1Z030 Installation, Start-Up And Service Instructions Manual

Pa1z packaged air conditioner
Table of Contents

Advertisement

PRE-START-UP
START-UP
Use the Start-Up
Checklist
supplied
at the end of this book,
and proceed
as follows:
I. CHECK FOR REFRIGERANT
LEAKS
Locate
and
repair
refrigerant
leaks
and charge
tile unit
as
follows:
1. Using
both high
and low pressure
ports,
locate
leaks
and
reclaim
remaining
refl'igerant
to relieve
system
pressure.
2. Repair
leak following
accepted
practices.
NOTE:
Install
a filter drier
whenever
the system
has been
opened
for repair.
3. Check system
for leaks
using
an approved
method.
4. Evacuate
refi'igerant
system
and reclaim
refrigerant
if
no additional
leaks
are found.
5. Charge
unit with R-22 refrigerant,
using a volumetric-
charging
cylinder
or accurate
scale. Ret_r ro zmJt roth\q
pie*re _)z"Fequh'ect d_afge. Be sure to add extra refriger
ant to compensate
for internal
volume
of field installed
filter
drier.
II. START-UP COOLING SECTION AND MAKE
ADJUSTMENTS
Use the Start-Up
Checklist
supplied
at the end of this book
and proceed
as follows to inspect
and prepare
the unit
for
initial
start-up:
1. Remove
all access
panels.
2. Read
and
follow
instructions
on all WARNING,
CAU
TION,
and INFORMATION
labels
attached
to, or shipped
with,
unit.
Make
the
following
inspections:
a.
Inspect
for shipping
and
handling
damages
such
as
broken
lines,
loose
parts,
disconnected
wires,
etc.
b.
Inspect
for oil at all refl'igerant
tubing
connections
and
on unit
base.
Detecting
oil generally
indicates
a
refl'igerant
leak.
Leak
test
all refl'igerant
tubing
con
nections
using
electronic
leak
detector,
or liquid
soap
solution.
If a refrigerant
leak
is detected,
see
following
Check
for Refrigerant
Leaks
section.
c. Inspect
all field
and
factory-wiring
connections.
Be
sure
that
connections
are
completed
and
tight.
d.
Inspect
coilfins.
If damaged
during
shipping
and
han-
dling,
carefldly
straighten
fins
with
a fin comb.
3. Verify
the
following
conditions:
a.
Make
sure
that
outdoor-fan
blade
is correctly
posi-
tioned
in
fan
orifice.
Top
edge
of blade
should
be
3.125
in. down
fl'om
condenser
outlet
grille.
See Coil
denser
Fan
section
on page
17.
b.
Make
sure
that
air filter
is in place.
c. Make
sure
that
condensate
drain
pan
and
trap
are
filled
with
water
to ensure
proper
drainage.
d.
Make
sure that
all tools
and
miscellaneous
loose parts
have
been
removed.
A. Checking Cooling
Control Operation
Start
and check the unit for proper
cooling control operation
as follows:
1. Place
room thermostat
SYSTEM
switch
in OFF posi
tion. Observe that blower motor starts
when FAN switch
is placed in ON position and shuts down when FAN switch
is placed in AUTO. position.
2, Place SYSTEM
switch in COOL position
and FAN switch
in AUTO. position.
Set cooling control below room tern
perature.
Observe
that
compressor,
condenser
fan, and
evaporator
blower motors start. Obselwe that cooling cycle
shuts
down when
control
setting
is satisfied.
3. When using an automatic
changeover
room thermostat,
place both SYSTEM
and FAN switches
in AUTO.
posi-
tions.
Observe
that unit operates
in Cooling mode when
temperature
control is set to "call for cooling" (below room
temperature).
III. REFRIGERANT
CHARGE
Amount
of refrigerant
charge
is listed
on unit
nameplate
(also
refer
to Table
1).
Unit
panels
must
be in place
when
unit
is operating
during
charging
procedure.
A. No Charge
Use
standard
evacuating
techniques.
After
evacuating
sys
tern,
weigh
in the
specified
amount
of refl'igerant
(refer
to
Table
1).
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pa1z042Pa1z024Pa1z048Pa1z036Pa1z060

Table of Contents