Tools And Materials Required; Remove The Packaging - GE Monogram ZV830 Installation Instructions Manual

30" chimney vent hood
Hide thumbs Also See for Monogram ZV830:
Table of Contents

Advertisement

Available languages

Available languages

Installation Preparation
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
[] Tape measure
[] Knife
[] Spirit level
[] Wire cutter/stripper
[] Wire nuts
[] Electric drill with 1/8" and 3/8" bits
[] Phillips and flat blade screwdrivers
[] Hammer
[] Pliers
Measuring tape
Pliers
[] Safetg glasses
[] Aluminized duct tape
[] Tape to mount template
[] Gloves to protect against sharp edges
[] 120V 60Hz. 15 or 20 Amp, 2 wire with
ground Properlg grounded branch circuit
[] Strain relief for junction cover
[] 8" round metal duct, length to suit
installation
[] Saw, jig saw or reciprocating saw
[] Tin snips
Aluminized
ducttape
Strain relief
Wire nuts
Spirit level
Tin snips
Electric drill
with 1/8" and
3/8" Bits
Safety glasses
head
screwdriver
Masking tape
Saw, jig saw or
reciprocating
saw
Gloves
Knife
Wire
cutter/stripper
Hammer
Flat blade
screwdriver
8" round metal duct,
length to suit
installation
REMOVE THE PACKAGING
CAUTION:
Wear gloves to protect against
sharp edges.
• Remove duct covers.
• Remove the parts box and other pieces. Locate
the literature
package.
• Remove and properlg discard the protective
plastic
wrapping
and other packaging
materials.

Advertisement

Table of Contents
loading

Table of Contents