Installation--Recirculating; Ductwork, Wiring Locations; Step 1, Install Framing For Hood Support - GE Monogram ZV830 Installation Instructions Manual

30" chimney vent hood
Hide thumbs Also See for Monogram ZV830:
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
INSTALLATI O N--R ECIRCU LATI NG
DUCTWORK,
WIRING LOCATIONS
• Determine the exact location of the vent hood.
• Locate the template packed with the literature.
• Measure 36" from the floor to the top of the cooking
surface. Add hood installation height determined on
page 7. Hark that location.
House Wiring
_
_"
Ceiling
Location-
_
1 I"
n.
Instellotlon
Helg_
AJlgn Bottom
Edge With
PendJ Line Indi_tlng
Bottom
of Hood
Align
Bottom
FtJge With
Pencil
Line Indlcoting
Bottom
of Hood
• Tape the template in position along the penciled line.
CHECK TO BE SURETHE TEMPLATEIS LEVEL.
• Use a level to draw a line straight up, from
the centerline on the template to the ceiling.
HOUSE WIRING LOCATION:
• The junction box is located on the top left side
of the hood.
• Wiring should enter the back wall at least 18"
above the bottom of the hood, and within 5-1/2"
of the centerline.
INSTALL FRAMING
FOR HOOD SUPPORT
IMPORTANT:
Freming must be capable
ofsupporting100 Ibs.
Centerline of
installation
space
<..
View from rear
cleats
1" x 6" rain.
mounting
support
If drgwall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
• Cut awag enough drgwall to expose 2 vertical studs
at the bracket location indicated on the template.
• Install a horizontal support at least 1" x 6"
between two wall studs at the mounting screw
location. The horizontel support must be flush with
the room side of the studs. Use cleats behind both
sides of the support to secure to wall studs.
IMPORTANT: Reinstall drywall for an even mounting
surface.
14

Advertisement

Table of Contents
loading

Table of Contents