Maintenance; Maintenance Schedule - Husqvarna Rider 20 ProFlex Operator's Manual

Hide thumbs Also See for Rider 20 ProFlex:
Table of Contents

Advertisement

The following is a list of the maintenance which should be conducted on the machine. For the items which
are not described in these instructions go to an authorised service workshop.

Maintenance

Check for fuel and oil leakage
Check the parking brake
Check the engine oil level (when you
refuel)
Check the fuel pump air filter
Check the seat safety switch
Check the lift lever safety switch
Check the parking brake safety switch
Check/clean the engine cooling air intake
Check the cutting unit:
blades are secure
condition of blades (sharpness,
shape, etc.)
blade synchronisation (90° between
BioClip)
Check steering wires (for play, etc.)
Check fasteners (screws, nuts, etc.)
Start engine and blades, listen for noise
Clean underside of cutting unit
Clean transmission air intake
Check battery acid level
Check transmission oil level
Check condition of V-belts, pulleys, etc.
Check for damage
Check tyre pressures (60 kPa)
Check for damage to wire guide at
articulated joint
Clean thoroughly around engine
Clean air filter (pre-filter)
Clean thoroughly around transmission
Clean all belts, pulleys, etc.
Lubricate pivot (nipple)
Lubricate belt tensioner (nipple)
Lubricate triangle link (nipple)
Lubricate seat suspension
Lubricate all wires
Lubricate safety lock on cutting unit
Lubricate inner stud on cutting unit
Lubricate slot for cutting unit tool frame
Lubricate bearing surfaces on cutting unit
Clean inside frame tunnel
Lubricate pedal mechanism inside frame
tunnel
18
– English
MAINTENANCE

Maintenance schedule

Page
Daily main-
tenance
before after
-
24
21
22
24
24
24
21
28
30
30
30
23
-
-
30
22
24
22
-
-
41
-
-
25
-
-
38
38
38
-
38
29
29
29
29
-
-
Maintenance interval in
At least
3)
Weekly
hours
once a
main-
year
25
tenance
50
100
300

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents