Stanley Supreme DF User Manual page 36

Table of Contents

Advertisement

Disconnect from electricity and gas before servicing. Check appliance is safe when you have finished
F. To Remove Oven Thermostats
1. Isolate from electric supply.
2. Proceed as 'TO REMOVE GRILL REGULATOR'.
3. Remove (10) back panel screws.
4. Remove thermostat phial and capillary through back of
cooker, note correct capillary route.
5. Re-assemble in reverse order.
G. To Remove Spark Generator
1. Isolate from electric supply.
2. Lower front mobility wheels (see section 'MOBILITY
WHEELS' in Users Instructions) and pull cooker
forwards to gain access to the rear of the cooker.
CAUTION: DO NOT STRAIN FLEXIBLE GAS
CONNECTION disconnect if necessary.
3. Remove mains cable inlet cover, 8 screws.
4. Disconnect electric cables to generator.
5. Remove two screws securing generator mounting
bracket to cooker frame and carefully withdraw
generator sufficiently to disconnect electrode leads.
6. Re-assemble in reverse order.
SERVICING - WARNING
H. To Remove Electrode
1. Isolate from electric supply.
2. Proceed as 'TO REMOVE SPARK GENERATOR'
disconnect the appropriate electrode lead.
3. Proceed as TO REMOVE THE HOTPLATE'.
4. Withdraw clip securing electrode to burner and
withdraw lead and electrode (see fig. below).
5. Re-assemble in reverse order.
I. To Remove Grill Element
1. Isolate from electric supply.
2. Remove two screws securing grill pelmet and remove
pelmet.
3. Remove two screws securing grill element fixing to
carrier to grill cavity and allow element and carrier to
hinge down from the rear.
4. The element can now be lifted out of the carrier to
allow access to the electric terminals at the rear.
5. Disconnect the terminals taking note of their
termination sequence and routing to avoid trapping
cables during re-assembly.
6. Re-assemble in reverse order.
36

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents