Checking The Static And Supply Pressure - Viessmann VITODENS 200-W Service Instructions Manual

Wall mounted gas condensing boiler natural gas and lpg version
Table of Contents

Advertisement

Further details regarding the individual steps
yes
Automatic calibra-
tion of the com-
bustion controller
For further fault details, see page 95.

Checking the static and supply pressure

Danger
CO build-up as a result of an incorrect burner setup can have serious health
implications.
Carry out a CO test prior to and after work on gas equipment.
Operation with LPG
Flush the LPG tank twice during commissioning/replacement. Vent the tank and gas
supply lines thoroughly after flushing.
Commissioning, inspection, maintenance
no
Fault Eb
1. Close the gas shut-off valve.
2. Release screw A inside test nipple
"PE" on the gas train, but do not
remove it; then connect the pressure
A
gauge.
3. Open the gas shut-off valve.
4. Measure the static pressure and
record it in the service report on
page 142.
Set value: max. 57.5 mbar.
(cont.)
Initiate a heat
draw-off. Switch
the boiler OFF and
ON again.
Press reset button
R.
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents