Detailed Pcb Installation - Toshiba Strata CIX40 R5.2 Software - R1 ~ R3 Hardware Installation And Maintenance Manual

R5.2 software - r1 ~ r3 hardware
Table of Contents

Advertisement

Detailed PCB Installation

This section includes the detailed installation steps for the CIX40 system PCBs.
Step 1: Set Switches on the
GMAU2/GMAU3/GMAU4 (Motherboard)
1. The GMAU2 (shown in
circuit has an associated pad switch. Set each circuit for 0dB or 3 dB pad.
2. Set SW1 to Standby (Power Off).
SW1
SW1
ON/OFF
STANDBY
ON
(Standby)
Figure 1-13 GMAU2 (R1 HW) PCB
Strata CIX40 R3 Installation & Maintenance
Figure
1-13) supports up to 3 CO lines with Caller ID (CLID). Each
05/10
CIX40 Installation
Detailed PCB Installation
P5
P6
P8
P7
P4
TB2
CO1
TB3
CO2
CO3
SW400
(3db/0dB)
SW500
(3db/0dB)
SW600
(3db/0dB)
3db
0dB
7113
1-25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Strata cix40

Table of Contents