HP 53131A/132A 225 MHz Programming Manual page 116

225 mhz universal counter
Table of Contents

Advertisement

Chapter 3 Programming Your Universal Counter for Remote Operation
How to Program the Counter to Synchronize Measurements
*SRE 32 are used to assert the SRQ line to alert the computer that the Counter
has completed a measurement. It is up to the computer to use the serial poll
command to determine which of the instruments on the bus requested service.
Of the three procedures discussed here, this is the most flexible, but also the most
complex.
:CALC3:AVERAGE ON
:CALC3:AVERAGE:COUNT 50
:TRIG:COUNT:AUTO ON
*ESE 1
*SRE 32
Set up program to specify service routine and enable interrupt when SRQ is
asserted.
:INIT
*OPC
Program could be doing other things while waiting for SRQ.
When SRQ occurs and the Counter has been identified as the cause of the SRQ,
ask for the data:
:CALC3:AVERAGE:ALL?
3-48
Enable statistics.
Base statistics on 50 measurements.
On INIT, take N measurements.
Summarize OPC bit for Status Byte
Register.
SRQ when event summary bit is 1 .
Start measurements.
Enable OPC bit.
Ask for statistics.
Programming Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

53131a53132a

Table of Contents