Teledyne 4030 Series Instruction Manual page 19

Total hydrocarbon (thc) analyzer
Table of Contents

Advertisement

Gas connections to the instrument are made at the 1/8"or 1/4"
stainless steel tube fittings provided on the rear panel. Note that the
Purge and Sensor Vent fittings are 1/4" while all other gas connections
are 1/8".
If the Sample line is heat traced to avoid condensation, the User
must ensure that a clean (2 micron or better filter) and heated sample,
maintained at a constant temperature not exceeding 120 C, is delivered
to the Sample Selector Module and the connection between the Sample
Selector Module and the Model 4030 is similarly heat traced. The
Sample Selector Unit contains provisions to accept tubing diameter in
the range of 1.25 to 1.50 inches, typically the O.D. of the heat-traced
lines.
It is recommended that all gas tubing leading to the connections on
the back of the analyzer be of the coiled type. This will facilitate sliding
the unit out of the case without disconnecting the gas supply to the
analyzer.
Teledyne Analytical Instruments
Figure 3-1: Gas Connections
Installation
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents