Building A Fire - Quadra-Fire 31M-ACC-GT Owner's Manual

3100 wood stove series, advanced combustion control (acc)
Table of Contents

Advertisement

3100 Wood Stove Series (ACC)
G. Building A Fire
Before lighting your fi rst fi re in the stove:
1. Confi rm the baffl e is correctly positioned. It should be
even with the front tube and resting on all tubes. Figure
28.1.
2. Follow instructions on page 32 for cleaning plated sur-
faces, if applicable.
3.
Remove all labels from glass.
There are many ways to build a fi re. The basic principle
is to light easily-ignitable tinder or paper, which ignites the
fast burning kindling, which in turn ignites the slow-burning
fi rewood. Here is one method that works well:
1. Open the Burn Rate Air and Start-Up Air Controls fully.
2. Place several wads of crushed paper on the fi rebox fl oor.
Heating the fl ue with slightly crumpled newspaper before
adding kindling keeps smoke to a minimum.
3. Lay small dry sticks of kindling on top of the paper.
4. Make sure that no matches or other combustibles are in
the immediate area of the appliance. Be sure the room
is adequately ventilated and the fl ue unobstructed.
5. Light the paper in the appliance. NEVER light or rekindle
fi re with kerosene, gasoline, or charcoal lighter fl uid; the
results can be fatal.
6. Once the kindling is burning quickly, add several full-
length logs 3 inches (76mm) or 4 inches (102mm) in
diameter. Be careful not to smother the fi re. Stack the
pieces of wood carefully; near enough to keep each
other hot, but far enough away from each other to allow
adequate air fl ow between them.
7. Set the Burn Rate Air Control and activate the timer
system (ACC).
8. When ready to reload, It is best to fully open both the
Burn Rate Air and Start-up Air Controls before reload-
ing. This livens up the coalbed and reduces excessive
emissions (opacity/smoke). Open door slowly so that
ash or smoke does not exit appliance through opening.
Large logs burn slowly, holding a fi re longer. Small logs
burn fast and hot, giving quick heat.
9. As long as there are hot coals, repeating steps 6
through 8 will maintain a continuous fi re throughout the
season.
NOTE:
• Build fi re on brick fi rebox fl oor.
• Do NOT use grates, andirons or other methods to support
fuel.
It will adversely affect emissions.
Page 28
Baffle Board even with front
tube & resting on all tubes
Ceramic Blanket on Top
Tube Channels
Figure 28.1
7033-277C
Burn Rate
Air Control
Start-Up
Air
Control
2 pc Baffle Board
March 2, 2007
R

Advertisement

Table of Contents
loading

This manual is also suitable for:

31m-acc-mbk31m-acc-nt31st-acc

Table of Contents